




Dau Giay Warehouse Project
- Clients: Sao Dau Co., Ltd.
- Location: Dau Giay Industrial Park, Dong Nai Province.
- Scale: 5 ha
- Completion: 2020
The Dau Giay Warehouse Project at Dau Giay Industrial Park, Dong Nai, is one of the key logistics facilities implemented by BIMBOO in 2020. Covering a total area of 5 hectares, the project required a fully integrated and modern design system for MEP, fire protection, and technical infrastructure, meeting the high standards of a large-scale storage and logistics facility.
To achieve this goal, BIMBOO applied BIM technology and the Revit platform, delivering a comprehensive design and management solution that ensured schedule compliance, cost optimization, and project quality.
BIMBOO’s Services Implemented in the Project
In the Dau Giay Warehouse Project, we delivered a comprehensive BIM MEPF solution, including:
1. Development of BIM MEPF model
-
Develop a detailed 3D model for mechanical, electrical, plumbing, HVAC, and fire protection systems.
-
Enables the investor to easily monitor and adjust the design from the early stages.
-
Eliminate technical conflicts among disciplines before construction, minimizing unexpected costs.
2. Design & management of MEP, fire protection, and technical infrastructure systems
-
Design of power, lighting, ventilation, and plumbing systems in compliance with high technical standards.
-
Implement effective and highly reliable fire protection solutions, ensuring full compliance with national standards.
-
Integrated management of technical infrastructure, ensuring stability and sustainability for long-term logistics operations.
3. Revit model management & project coordination
-
Manage all project data on the Revit platform, ensuring transparency and accuracy.
-
Support coordination among disciplines, minimizing design and construction errors.
-
Closely monitor project progress, supporting the investor in controlling quality and costs.
The Value BIMBOO Delivers to Clients
By applying BIM MEPF in the Dau Giay Warehouse Project, the client gained numerous practical benefits:
-
Design optimization: The visual BIM model enables easier management, modification, and approval.
-
Risk minimization: Early detection of design conflicts, reducing unexpected costs during construction.
-
Cost & time savings: Accurate quantity control, optimized scheduling, and on-time project completion.
-
Operational safety: MEP and fire protection systems are designed to meet standards, ensuring maximum safety.
-
Long-term management support: The BIM model serves as a key tool for future warehouse maintenance and operations.
The Dau Giay Warehouse Project in Dong Nai is clear evidence of BIMBOO’s capability in delivering comprehensive BIM MEPF services. With an experienced team of engineers and advanced BIM technology, we are committed to providing optimized solutions that help clients save costs, ensure on-time delivery, and enhance project quality.
💖 View more projects: BW Warehouse Project
💖 See more: What is the BIM process? Application of Revit in BIM.